You do not need a finished tech pack to start

Brands come to us at different stages. Some have detailed specs. Some have a reference photo and an idea. Some need to repeat a winning style. The workflow adapts to where you are — not the other way around.

Starting from an idea

A mood board, a reference pair, sketches, or AI-generated visuals. You don’t need a tech pack — we help shape the product direction before development begins.

Starting from a tech pack

If your specs are ready or partially ready, we assess manufacturability, flag potential issues, and move straight into sourcing and development.

Starting from a reorder

If you’re repeating an approved style, the original specs stay on file. We pick up where the last order ended — same wash, same fit, same standard.

Five stages from first contact to finished product

Each stage has a clear purpose, a defined deliverable, and an approval point where you decide what happens next.

Step 1

Step 2

Step 3

Step 4

Step 5

What to prepare before we start

The more complete your information is, the faster we can evaluate and move into development. But you don’t need everything ready — incomplete briefs are normal, and we help fill in the gaps.

Design Direction

Tech pack, sketch, mockup, reference garment, AI visual, or clear front/back/side reference images.

Sizing Information

Size chart, sizing reference, or target fit direction so we can align measurements before cutting.

Branding & Trims

Logo files, label requirements, hardware direction, packaging needs, or existing trim references.

Commercial Scope

Sample only or bulk? Expected quantity, target market, and delivery window.

How long each stage typically takes

Timelines depend on fabric availability, wash complexity, and revision rounds — but these are the working benchmarks we plan around.

10H

Initial project response

We review your brief and confirm feasibility

72H

VIP rush sample · elapsed hours

VIP clients only; confirmed specs and stock fabric, for existing-client projects or familiar styles

3–7

Working days for standard samples

Pattern, cut, sew, wash, inspect, photograph

15–22

Calendar days from our order confirmation, usually for repeat orders

Cutting, sewing, washing, QC, packing, shipment

Complex washes, custom hardware, and multiple revision rounds can extend the timeline. Repeat orders are usually faster because approved specs stay on file.

Worker checking denim fabric panels on the production floor

What you see along the way

You should never have to guess where your project stands. At every critical stage, you receive a confirmation, a deliverable, or a request for your approval — not silence.

Review Our QC System

18

Core Team Members

20+

Integrated Partner Factories

100+

Current Supply Chain Partner Companies

3

Current Production Regions
Xintang · Yulin · Kaijiang

Quality gates run across every order — pre-sampling, sampling baseline, pre-production, in-line, and reorder reference.

Common questions about the process

That’s normal — many brands start without one. You can begin with sketches, reference photos, a sample garment, or even a mood board. Our team helps clarify construction, measurements, fabric direction, and wash details before development begins.

At minimum: reference images or a description of what you want to make, your target quantity, and a rough timeline. The more detail you provide — sizing, fit direction, wash preference, branding — the faster we can move. But we can guide you through what’s missing.

Standard samples take 3–7 working days after fabric, specifications/pattern and required input materials are confirmed. Complex processes and revision rounds are assessed separately. VIP rush sampling is available only to eligible VIP clients: 72 elapsed hours, with confirmed specifications and available stock fabric, for existing-client projects or familiar styles.

The approved construction, wash recipe, sizing, trims, and packaging requirements are locked in and carried into production. QC uses the approved sample as the reference standard for bulk — so what you signed off on is what gets produced.

You receive structured updates at each key milestone: after project assessment, after sample completion, before production starts, during QC, and before shipment. You always know what stage the project is in and what still needs your approval.

The main factors are fabric availability, custom trim lead times, wash complexity, how many revision rounds are needed, and how quickly you confirm approvals. Repeat orders are usually faster because all approved specs are already on file.

Yes. Once a style is approved, every key specification stays on record — wash recipe, measurements, construction details, QC baseline. That means repeat production starts from where the last order ended, not from a blank slate.

Yes. New brands benefit from clearer step-by-step guidance and development support. If you don’t have denim production experience, the structured workflow helps you move forward without having to figure out each stage on your own.